Project: N524JL/N87JL   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Jeremy Leonard   -  
Project:   Vans - RV-7A   -   VIEW REPORTS
Total Hours:1074
Total Flight Time:
Start/Last Date:Mar 17, 2021 - No Finish Date
Engine:Lycoming IO360M1B
Propeller:Sensenich 3 Blade Composite Ground Adjustable/Fixed pitch
Panel:Garmin G3XTOUCH/GNX375/G5/GTR200/GFC507
 
Friendly URL: https://eaabuilderslog.org?s=N524JL/N87JL

Home or Last Project Picture

Nov 01, 2023     Completed fuselage prep after disassembly - (25 hours)       Category: Fuselage
Over the last couple of weeks I have been steadily working on the long, long list of things that I needed to complete before beginning to rivet the fuselage together for the final time. Included in this was the crap load of machine countersinks, debur all edges, dimple all holes, prime the pieces that need to be, install the 715 ribs, install the 623 and their corresponding clips and clean up all metal shavings that have found their way into the central fuselage. I also riveted the doubler plates onto the wing skin with the rivets around the inside.
The longerons were quite the undertaking to complete. Glad they are finally done.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.